Using DP30-Cs as a 10 MHz and 1 PPS Reference

Timing guide Published

Plan the frequency and pulse connections from a DP30-Cs cesium clock and verify each output at the receiving equipment.

The DP30-Cs provides a stable 10 MHz reference and 1 PPS outputs. Use 10 MHz when a receiver needs a frequency reference. Use 1 PPS when the receiver needs a pulse marking the second boundary. A pulse alone does not carry the date and time of day.

Match the electrical interfaces

Check the connector, impedance, signal level and termination for the exact pair of devices. When a long run or a distribution amplifier is required, include its delay and loss in your commissioning checks. Confirm whether the receiver also requires an independent time-of-day input.

Verify frequency and pulse timing separately

  1. Identify the expected active reference on the receiving equipment and confirm that it is locked to the intended input.
  2. Measure the 10 MHz signal at the receiving end under its normal termination.
  3. Compare the 1 PPS pulse to a known reference and document the cable path, any compensation applied and the measured phase difference.

The DP30-Cs datasheet lists the available outputs and external 1 PPS input. Check the timing input options of a receiving time server such as FL6000 before specifying a connection.

Download Datasheet

Email tech@feilink.com.cn to request a username and password for this product family.